When we woke up yesterday morning, there was Suntis moored on Griffin Wharf with the ABP crane doing the unloading. This went on all day, with a break for lunch, of course. It then went on into the night. I think that they were desperate to get the ship back out again to try and make up for the lost days.
Then we got up this morning to find here gone!
That’s the quickest turnaround that we have seen since we have been here.
If you look closely there appears to be a lot of wood stored over there. I thought that they only had the site next to us and the one further up Landseer Road – inside the port. Are they keeping wood over the other side? It would be a huge transport effort to shift all of that out of the Whearsted Road gate and round to this side of the dock. This would mean using the Orwell Bridge or coming round the one way in town. We haven’t seen much coming in here. Interesting!